Newly built by Kiewit, the Los Angeles County Metropolitan Transportation Authority (Metro) Gold Line Operations Campus in Monrovia, CA features a 280-ft wide, 30-ft tallLSX solar canopy array installed by Hot Purple Energy. Designed by Parsons to meetLEED Gold Standards, the construction of the new Campus was overseen by Foothills Gold Line.
Modules: (714) LSX 250 clear backsheet
Racking: LSX Direct Mount
See all the news about this project: