Metro Gold Line Operations Campus to meet LEED Gold Standard with LSX

Newly built by Kiewit, the Los Angeles County Metropolitan Transportation Authority (MetroGold Line Operations Campus in Monrovia, CA features a 280-ft wide, 30-ft tallLSX solar canopy array installed by Hot Purple Energy. Designed by Parsons to meetLEED Gold Standards, the construction of the new Campus was overseen by Foothills Gold Line

Modules: (714) LSX 250 clear backsheet
Racking: LSX Direct Mount

See all the news about this project: